Crimean Bridge built

2015 CE.

Shown on the map at 45.309°, 36.506°.

The Crimean Bridge (Russian: Крымский мост, romanised: Krymskiy most, IPA: [ˈkrɨmskʲij most]; Ukrainian: Кримський міст, romanised: Krymskyi mist), also called Kerch Strait Bridge or Kerch Bridge, is a pair of parallel bridges, one for a four-lane road and one for a double-track railway, spanning the Kerch Strait between the Taman Peninsula of Krasnodar Krai in Russia and the Kerch Peninsula of Crimea. Built by the Russian Federation after its annexation of Crimea at the start of 2014, the bridge cost ₽227.92 billion (€3.23 billion) and has a length of 19 km (12 mi), making it the longest bridge in Europe and the longest bridge ever constructed by Russia. In January 2015 the multibillion-dollar construction contract for the bridge was awarded to Arkady Rotenberg's Stroygazmontazh. Construction began in February 2016. The road bridge was inaugurated by Russian president Vladimir Putin on 15 May 2018. It opened for cars on 16 May and for trucks on 1 October. The rail bridge was inaugurated on 23 December 2019 and the first scheduled passenger train crossed the bridge two days later. The bridge was opened for freight trains on 30 June 2020.

Text from the Wikipedia article Crimean Bridge, licensed CC BY-SA 4.0.

Everything else in 2015 CE

HistoryLayer draws the world as it was in any year from 123,000 BCE to 2026. Move the slider and the borders redraw for that year; the map carries 23,890 events, 12,790 people, 837 wars and 13,183 cities, each one readable in place. Signing in is optional and lets you keep what you find.

HistoryLayer
1914CE
World Wars
123,000 BCE2026 CE
54 stops — one per surviving map on file, evenly spaced drag the pin · ←→ steps one stop the same 54 stops by true elapsed time ↑
Map & filters
Show on the map
Filter
Colour by
Polity Empire